Day

June 15, 2016
During this remote sump closure BioLogix was successfully used to remediate a remote oil field sump previously left untreated for decades.  Closure required all non-utilized oil production sumps closed to a cleanup standard of <1% concentration.  Successful and timely closures were achieved with BioLogix. The timeframe for successful closure varied with the sump size and level...
Read More